Installation Requirements for Voltage and Current Transformers

Installation Requirements for Voltage and Current Transformers

1. The transformers should be in good condition, with good insulation, clear secondary wiring markings, and secure connection of the terminals; for oil-immersed transformers, the oil level indication should be normal, and there should be no leakage or seepage at the connection points of the porcelain sleeve flange and the oil drain valve.

2. The installation surface of the transformers should be level; for transformers installed in series, they should be arranged neatly; the polarity directions of the same group of transformers should be consistent.

3. When the plugs of the breathing holes of the transformers have gaskets, the gaskets should be removed before energization.

4. For busbar-through current transformers with equipotential spring supports, all spring supports should be firmly installed and in good contact with the busbar; the busbar should be located at the center of the transformer.

5. The positions of the secondary wiring terminals and the oil level indicators of the transformers should be on the side that is convenient for inspection.

6. For transformers with desiccant traps, the desiccant should be dry, and the oil level in the oil seal should be normal.

7. In transformers with voltage equalization rings, the voltage equalization rings should be firmly installed, level, and in the correct direction.

8. Capacitive voltage transformers must be installed according to the component numbers provided in the product package and cannot be interchanged. When dampers are installed outdoors, there should be rainproof measures.

9. The contact surfaces of all connections should have the oxide layer removed and be coated with conductive paste or power composite grease.

10. The following parts of the transformers should be grounded:
① For graded insulation voltage transformers, the grounding terminal of the primary coil.
② For capacitive insulation current transformers, the terminal of the primary coil’s neutral screen and the grounding terminal of the iron core.
③ The transformer casing.
④ The secondary coils of unused current transformers should be short-circuited and grounded.

11. Installation requirements for zero-sequence current transformers:
① The transformers and other unrelated energized conductors should not be too close to each other.
② The framework or other magnetic conductors of the transformer or other components should not be in direct contact with its iron core or form a magnetic circuit with it.